vrijdag 16 juli 2010
Laying Trackbed
The first ramp completed successfully is the right curve of the main line oval. After hours of trying to get everything just right, it was time to lay down the very first section of track bed. I glued down one half at a time in about 20� lengths. I used WeldBond multi-purpose glue and thumb tacks to temporarily hold the track bed in place.
Once the track bed was dry, I loosely placed 22� radius track (as per plan) to make sure everything fit, which it did.
Abonneren op:
Reacties posten (Atom)
Geen opmerkingen:
Een reactie posten