zaterdag 14 augustus 2010
Laying Track - Part II
I�m still not sure how the descending grade from the trestle is going to work out with a full set of cars and engines. It�s just so steep as it needs to drop down 3.5 inches in a very short distance, leveling out briefly halfway for the crossing. This is the one part of this whole project that has me worried. At this point the layout is divided into the planned 12 electrical blocks, using insulated terminal joiners. I have also attached all terminal connectors, feeding the wires through drilled holes to the underside of the table (pictured below).
Tomorrow (which I guess now is today), I plan to paint the turn table to make it look a bit more realistic, and finish attaching the approaching tracks. The big project now is to start the wiring and construction of the control panel. The under-table switches and wiring components also need to be done at this point. I also need to test me track with an engine, so for the mean time I will probably just attach all the terminal connectors to one main wire and control box, just to test things out. That will be a next weekend project.
Abonneren op:
Reacties posten (Atom)
Geen opmerkingen:
Een reactie posten